Non Measurable Sidewalks (0)
Sidewalk Run Priority (1)
| Very Low Priority (<0.75) |
| Low Priority (0.75-1) |
| Medium Priority (1-3) |
| High Priority (3-5) |
| Very High Priority (>=5) |
| <all other values> |
Sidewalk Segment Priority (2)
| Very Low Priority (<0.75) |
| Low Priority (0.75-1) |
| Medium Priority (1-3) |
| High Priority (3-5) |
| Very High Priority (>=5) |
| <all other values> |
Sidewalk Pavement Score (3)
| Low Score (<1) |
| Medium Score (1-3) |
| High Score (>=3) |
| <all other values> |
Sidewalk Level Change (4)
| Acceptable (<0.25 in.) |
| Acceptable if has appropriate bevel (0.25-0.5 in.) |
| Unacceptable (>0.5 in.) |
| <all other values> |
Sidewalk Cross Slope (5)
| Compliant (<=2%) |
| Non-Compliant (>2%) |
| <all other values> |
Sidewalk Running Slope (6)
| Compliant (<=5%) |
| Non-Compliant (>5%) |
| <all other values> |
|